Wies Design Lab New European Bauhaus. EIT Community New European Bauhaus. Funded by the European Union.

Earth, Architecture & Code

A rural design laboratory in a Polish village, run in two phases — a week of workshops on site, and eight months of incubation for the projects that come out of them.

Ignite NEB 2026 Nowa Wola, Mazovia 2026 – 2027

The idea

From a Polish village to a new architectural imagination

Polish peri-urban villages hold the clay, straw and timber knowledge that built rural Poland for centuries — and are quietly losing it. Wies Design Lab puts that knowledge back to work, and turns the week into ventures.

A hatched landscape: sun, green field furrows, poplar, wheat, water and berries.

Earth

Glina · Słoma · Drewno

Clay, straw and timber from within reach of the village. A living system, not heritage.

A village house drawn in parallel strokes: hatched roof, blue timber wall, arched door, tree and field.

Architecture

Place-based design

Fieldwork, survey drawing, hands-on making. Decisions argued on site with the people who live there.

A nine-square grid of hatched tiles, each a fragment of field, furrow or window.

Code

Digital fabrication

Parametric tools, 3D-printed raw earth and robotics — our EU research, applied to a village yard.

New European Bauhaus alignment

Beautiful, sustainable, together — on a village scale

The NEB values are not a label added at the end. Each one sets a constraint the programme designs against, in both phases.

A new aesthetic vocabulary

Beautiful

Vernacular form meets contemporary craft. The closing village-square festival turns the week into a lived experience rather than a rendering.

Low-carbon by design

Sustainable

Local clay, straw and timber. Circular material flows, climate-adapted construction, and an honest account of what each prototype costs the ground it stands on.

Villagers as co-designers

Together

Intergenerational fieldwork, paired teams, and everything the week learns written down and given back to the host community. Reciprocity, not extraction.

NEB thematic axes

Primary axis

Long-term, life-cycle and integrated thinking. Earth-based construction and circular design as a coherent rural-economy proposition.

Secondary axis

Reconnecting with nature. Place-based materials, biodiversity awareness, climate-adaptive practice.

Tertiary axis

Regaining a sense of belonging. Intergenerational exchange and a working rural–urban dialogue.

The village

A village centre that was never drawn

Nowa Wola sits south of Warsaw, in Piaseczno municipality. At its centre is a pond — willows, reeds, ducks and a few benches — and no plan around it: no path, no shade, no lighting, no shelter.

The pond at the centre of Nowa Wola on a summer evening, willows and reeds along the far bank, ducks on the water and village houses behind.
The mown bank of the pond with a single bench, a large willow and cars parked at the edge.
The open meadow beside the pond with a small wooden shelter, birch trees and new housing along the far edge.

People use it anyway, around its edges. The distance between what this place could be and how little has ever been asked of it is where Wies Design Lab starts.

Community consultation

The village has already answered

249 residents · five questions · 38 written comments. Run in Polish by the local community, before Wies Design Lab existed.

  • 81%want a place to rest and relax
  • 78%ask first for benches and seating
  • 68%want it to serve every generation equally

What matters most here

A place to rest and relax

81%

Which elements to provide

Benches and seating — ahead of every built attraction

78%

Which ecology to add

A flower meadow, then bird nesting boxes

67%

Who it should serve

All age groups equally

68%

What to do with the water

Benches facing it, then a boardwalk — not angling

74%

An important point — do not create a concrete desert; keep the area green.
One of 38 written comments. The warning against betonoza — concrete disease — runs through a quarter of them.

Respondents were self-selecting, so this reflects engaged residents rather than a representative sample. Percentages are of respondents per question; several questions allowed more than one answer.

Four architectural analysis boards of Nowa Wola: solid-void showing rural building density, function analysis in colour, road analysis with field paths, and green space analysis showing the strip pattern of agricultural land.
Before anyone designs anything, Wies Design Lab reads the place — solid and void, function, movement, green. Participants extend these boards with what only the village can supply.
  • Built fabric
  • Residential
  • Leisure / public
  • Agricultural / open
  • Forest
  • Water

Phase 1 · Wies Design Lab

Preparation, then five days in the village

Phase 1 runs from September to October 2026. Three open calls, then five days in Nowa Wola that close with a jury naming the two teams who continue into phase 2.

Before the village

7 – 19 Sept

Open call · workshop tutors. One tutor leads each of the four to five parallel workshops in clay, straw and timber. Applications are reviewed in the week of 21 September.

23 Sept – 10 Oct

Open call · Changemakers. Selection and announcements run through the week of 12 October, with online briefings before the event. The Challenge Owner call runs alongside and stays open right through to the last day of the event.

By 9 Oct

The jury is appointed. Five members from five different fields — EIT Community NEB, the local authority, a Challenge Owner, design and business — so that no single perspective decides.

September to October, week by week

The five days · 20–24 October 2026

Day 01 · Discovery

Arriving on the village's terms

  • Welcome ritual co-curated with villagers — Wies Design Lab is introduced by the community, not to it.
  • Village walk across the four analysis boards, on foot, with the people who live in them.
  • Paired intergenerational fieldwork: each Changemaker is matched with a village elder.
  • Listening dinner at the świetlica — the village hall — where the day's findings are told back.

What phase 1 produces

Goes into phase 2

4–5 team projects, two of them funded

Four or five team proposals developed across the week, each with a working model and a business case. The jury selects two to enter the eight-month incubation.

Stays in Nowa Wola

A documented village knowledge map

The shared map drawn on Day 02, the catalogue of local materials and techniques recorded during fieldwork, and the exhibition itself — compiled and handed to the sołtys and the świetlica as an open record the village can keep using.

Open calls

Three ways into Wies Design Lab

Taking part is free — accommodation, meals and materials across the five days are covered. Places are limited and each call closes once it is full. Write to us with the subject line on the card.

23 Sept – 10 Oct · 25–30 places

Changemakers

The participants. Architects, designers, students, makers and social scientists who form the four to five teams and work in the village for the week.

  • Five days on site, Tuesday 20 to Saturday 24 October 2026
  • Teams of five to seven, one per workshop
  • Working languages: English and Polish
  • Two teams continue into phase 2
Apply as Changemaker

7 – 19 September · 4–5 places

Workshop tutors

One tutor leads each of the parallel workshops in clay, straw and timber — setting the brief, running the making and guiding a team through the week.

  • On site for the full five days
  • Practice in earth building, circular construction or digital fabrication
  • Applications reviewed in the week of 21 September
Lead a workshop

Open until 24 October · 3–5 places

Challenge Owners

The village’s side of the table. Sołtys, gmina representatives, local NGOs, cooperatives and village elders who hold the knowledge behind the brief and stay with it from October through to June.

  • Brief the teams on what the consultation could not capture
  • A Challenge Owner takes one of the five jury seats
  • Recruit the residents who test the prototypes in spring
  • Speak at the Village Demo Day about what changed
Join as Challenge Owner

Mentors and technical experts are not part of this call. They are contracted for phase 2 after the two ventures are chosen, so that the expertise matches what those ventures actually turn out to need — if you work in earth and bio-based materials, computational fabrication, product manufacture or venture building, write to us anyway and we will hold your profile for November.

Phase 2 · The Incubation

Eight months from workshop proposal to registered venture

The two teams the jury names on 24 October carry straight on into November. Eight months later each one is a registered company with a design that has been made, tested in the village and costed — shown twice in public in June.

  • Monthly mentoring10–12 sessions per venture, plus two cohort clinics
  • Expert days6–8 contracted specialists, matched after the diagnosis
  • FabricationStudio access, tools and a desktop clay printer
  • Legal supportAdvisor engaged from April, through to registration

€4,000

goes to each of the two winning teams — €8,000 in total. It exists so that people who cannot afford to work unpaid can still take part.

It is released in three slices against three checkpoints, marked in the schedule below. Nothing is paid up front.

The schedule, month by month

  1. Month 1Nov 2026

    Diagnosis and matching. Your venture is profiled across material, fabrication, product and market. Mentor team formed, work plan signed.

    Gate 1 · €1,600

  2. Month 2Dec 2026

    Design development opens. The workshop proposal becomes a design. A parallel study asks what materials are available locally and at what cost. First validation round with the village.

  3. Month 3Jan 2027

    Design iteration. Detailing and buildability — dimensions, joints, assembly, finish — until it can actually be made. Business model canvas opens.

  4. Month 4Feb 2027

    Prototype and cost reality. The design is frozen and made at component and small-model scale. Bill of materials, suppliers, unit cost.

    Gate 2 · €1,200

  5. Month 5Mar 2027

    Testing in the village. The prototype goes in front of residents, the seniors' group and community volunteers in Nowa Wola. Recorded, ranked findings.

  6. Month 6Apr 2027

    Refine and position. Findings go back into the design. Pricing and route to market fixed, legal form decided, filings prepared.

  7. Month 7May 2027

    Register and validate. The entity is registered — sp. z o.o., fundacja, stowarzyszenie or spółdzielnia socjalna. Second test round, then pitch coaching.

    Gate 3 · €1,200

  8. Month 8Jun 2027

    Two Demo Days, and a written transition plan into Catalyse, Connect or Co-Create NEB.

It ends with two Demo Days

Twelve days apart, in front of two different audiences: the village that co-designed the work, and the Warsaw business ecosystem.

Saturday 5 June 2027

Village Demo Day · Nowa Wola

Held at the pond and the local authority building, with the gmina and the community groups. The work is shown where it was tested, in front of the people who tested it — on a Saturday, so working villagers and families can come. Challenge Owners speak to what changed in the village.

Thursday 17 June 2027

Warsaw Demo Day · Venture Café

Inside the Venture Café Thursday Gathering at CIC Warsaw, which brings its own standing audience of founders, investors and ecosystem partners. Two now-registered entities pitch. A village delegation travels in for it, and the day is filmed.

Scope: the incubation produces component prototypes and small-scale models, not finished construction. Building a proposal at full scale in the village sits outside this programme.

Who takes part

Sixty-five to a hundred people, in six roles

These are the phase 1 numbers. Phase 2 narrows to the two selected teams, their mentors and the end users who test what they build.

Participant mix — phase 1, October 2026
GroupCountRole in the workshops
Changemakers25–30Architects, designers, students, makers and social scientists. Form the 4–5 teams.
Workshop tutors4–5One per workshop, leading the making in clay, straw or timber.
Challenge Owners3–5Sołtys, gmina representative, local NGO, cooperative, village elder.
Jury5Five fields, five seats: EIT Community NEB, the local authority, a Challenge Owner, design and business.
Village community20–40Co-designers, hosts and knowledge holders. Active across all five days.
Day visitors & public10–20Open evening seminars, closing festival, regional design ecosystem.
Total reach67–105Comfortably above the 50-participant floor set for the cohort.

The argument

Reciprocity, not extraction

Conventional rural-development models move value in one direction: from city to village. Wies Design Lab treats every participant, urban or rural, as both contributor and learner — and writes down what each side brings.

City → village

  • Design methodologies and visual language
  • Digital fabrication and parametric tools
  • Business modelling and legal-entity expertise
  • Access to funders, networks and markets
  • New interpretations of local resources

Village → city

  • Vernacular earth-building knowledge
  • Tactile, place-based material literacy
  • Communal living and intergenerational practice
  • Climate-adaptive, low-carbon construction wisdom
  • Slow time and seasonality as design parameters

Full timeline

Both phases, end to end

Where the project stands today, and what comes next.

June – August 2026 Now

Set-up. Host selection confirmed on 19 June, kick-off on 20 July, then research, visual identity and the village search that ended in Nowa Wola. The site goes live at the end of August.

Phase 1
September – October 2026

Three open calls. Workshop tutors 7–19 September, Changemakers 23 September to 10 October, Challenge Owners until the event itself. The memorandum of understanding with the village partners is signed on 15 September and the jury is appointed by 9 October.

Phase 1
20 – 24 October 2026

The five days in Nowa Wola. 50+ participants, public exhibition, festival, and the jury selecting two teams.

Phase 2
November 2026 – June 2027

Eight-month incubation: mentoring, design development, prototyping and testing in the village. Two legal entities registered by May.

Phase 2
5 and 17 June 2027

Two Demo Days — Nowa Wola on 5 June, then Venture Café in Warsaw on 17 June. Each venture leaves with a written transition plan into Catalyse, Connect or Co-Create NEB.

July – December 2027

Closure. Reporting, final settlement and the project archive, after delivery ends in June.

The calls are open

Changemakers, workshop tutors and Challenge Owners for five days in Nowa Wola, 20–24 October 2026.

See the three calls